EconomicalIndustry and trade

Investigation of fire problems of nature industrial unit


Facilitation Working Group And fix Barriers to production in the province The center was held in the presence of the Deputy Minister of Industry, Mines and Trade and the central governor in Zarandieh governorate with the focus on investigating the problems caused by the fire of the industrial unit ‘Green Nature of Old Pars’.

According to Shata, Ali Rasoulian, Public Relations Officer of the Small Industries and Industrial Towns Organization of Iran, traveled to Markazi province and attended the Mamouniyeh Industrial Town, where a fire broke out last Wednesday in the ‘Green Nature of Old Pars’ industrial unit, which caused extensive damage. He visited about five hectares of the factory’s sheds, roofed halls and warehouses.

In this visit, which was accompanied by the central governor and insurance representatives, the dimensions of the accident were closely examined and the relevant expert’s proposal was made to make the necessary decisions in Facilitation Working Group And fix Barriers to production in the province Central was presented.

270 towns and industrial areas in the country are equipped with firefighting equipment

Deputy Minister of Industry, Mines and Trade at the meeting Facilitation Working Group And fix Barriers to production in the province The center, which was held in the meeting hall of Zarandieh governorate, said: in order to prevent unexpected accidents and fires, 270 towns and industrial areas in the country have fire equipment and machinery.

Ali Rasoulian added: “The fire in the ‘Green Nature of Old Pars’ company was a very bitter incident, but fortunately all the managers were on their feet and were able to manage this incident.”

He added: “There are more than 327 fire trucks in the country that carry out firefighting in case of fire, and more than 270 towns and industrial areas in the country have fire engines.”

The Chairman and CEO of the Small Industries and Industrial Towns Organization of Iran continued: The necessary planning for training to deal with accidents is being carried out accurately and seriously in the towns and industrial areas of the country and in this regard, accidents and especially fire casualties in Production units are reduced.

Rasoulian announced the forecast of funds to strengthen the necessary infrastructure to prevent accidents, improve the level of work safety and relief equipment in industrial estates and said: it should be possible to create conditions for industrial and production units that suffer from fires for any reason. Accidents and accidents occur, return to the production cycle as soon as possible and do not damage production in these units.

He expressed hope that with the determination of the owners of the production unit ‘Green Nature of Old Pars’ and the support of officials in the shortest possible time, the production of this company will return to its original state.

10% of the country’s oil consumption in Nature Company Zarandieh is produced

The central governor also said in the meeting: “After the very bitter and unfortunate incident of the fire in the nature factory of Zarandieh city, today all provincial managers along with national senior managers are determined to use the legal capacities to restart this effective industrial unit in the country’s production.” .

Seyed Ali Aghazadeh added: The fire incident in Nature Company It has caused heavy damage to the production spaces, and the insurer should evaluate the amount of damage as soon as possible and pay a certain amount of damage as an advance payment.

He added: Nature Company Zarandieh city produces more than 10% of the country’s oil, and with the measures taken, there will be no shortage in supplying the country’s oil for public consumption, and soon this complex will return to the production cycle with the determination and will of the investor.

Accelerating the assessment of the initial damage and determining the advance payment, allocating the required currency and accelerating the import of raw materials along with tax and insurance debts, as well as land transfer and issuance of legal permits to revive the production line of the industrial unit ‘Green Nature of Old Pars’ are the most important The issues raised at the meeting were:

Also in this meeting, the necessary mechanism for re-launching this production unit will be adopted and its approvals in the form of decisions. Facilitation Working Group And fix Barriers to production in the province Central was sent to the National Headquarters.

The factory ‘Green Nature of Old Pars’ caught fire at 3:30 in the morning on October 19 due to the connection of electrical wires, and after about a day and a half with the efforts of the fire brigade of Zarandieh and the cooperation of fire brigades from Saveh, Robat Karim And Islamshahr was restrained.

The industrial unit ‘Green Nature of Old Pars’, which was built with an investment of 2,250 billion rials on a 90,000-square-meter land in the Mamuniyeh industrial town and was put into operation in 2012, has a production capacity of 671,000 tons of liquid and solid oils. Edible, it has 191,400 tons of flavoring and packaging of teas, vegetable and animal oils and fats, grains and cereals and rice, sugar, nuts, paste, as well as 5,910 tons of steel and iron utensils per year. And has provided employment opportunities for 250 people.

At present, 50 branches and 30 active agencies across the country are responsible for distributing the company’s products under the ‘Nature’ brand.

Leave a Reply

Back to top button