Legal and judicialsocial

Inauguration of Labbafinejad Hospital projects in Tehran


According to the Fars News Agency Health Group, the construction of the heart and lung ward of this hospital on a 500-square-meter land had started in March 2010 and this ward has a capacity of 21 beds and has been built and equipped with a credit of 4 billion Tomans.

Also, the CCU intensive care unit of this hospital, which was built and equipped during three months on a land area of ​​200 square meters, has 7 beds and advanced echocardiography, including three-dimensional echo and echocardiography, for which two and a half billion tomans of credit Is spent. The pavilion of the professors of this hospital has been built and equipped in a land with an area of ​​200 square meters and a credit of over two billion Tomans in 4 months.

Bahram Ainollahi also visited the exhibition of health and medical achievements of Shahid Beheshti University of Medical Sciences in the post-revolutionary period.

End of message /




Suggest this for the front page

Leave a Reply

Back to top button